Tagalder (2000) Incorporated signed a
Letter of Intent to acquire Heibei Province Suan Group Co., Of
Beijing ("Suan"). Suan is an engineering company
specialized in sewer rehabilitation --and have nearly 20 years of
experience in the trenchless pipeline rehabilitation business.
|

|
|
Murray Eades, Tagalder's Chairman, at the
center left
and
Wang Chuan Hai, Suan's Managing Director, at the center
right
|
Suan's patented technologies in this area allows the corporation to
expand their business rapidly. Many cities will depend on Suan to
anticipate and deal with jobsite issues before they turn into
problems. Suan assures the project will be completed safely, on time
and within budget.
The
Pipe-In-Pipe Technologies
Suan has developed a process and procedure in
trenchless pipeline rehabilitation:
|
Step 1:
After completed the case study of the project
and determine the process, the resin-filled tube will be
inverted (turned inside out) and rest at the launch station.
|

|
Step 2:
The tube will be pushed forward by pumping
water or air into it. and inversed along the old tube. Since
the inner resin-filled surface will stick to the old tube, the
Pipe-In-Pipe will present a smooth surface. |

|
Step 3:
After the Pipe-In-Pipe is in place, the new
tube will be solidified by applying hot temperature or
pressure. When finish, the rehabilitated tube is completed
without digging up the trench. |

|
Project Reference
Suan has been contracted by many cities in the
pipe rehabilitation projects. Provided herewith a few project
references:
The Great Success of Beijing Chang An Street Project
Zhong Nan Hai in Chang An Street of Beijing is the office
compound of Chinese leaders. The rehabilitation project of 7 km gas
pipeline continued for two years until it came to the section of Zhong
Nan Hai. The government would not allow construction team to dig
up the trench in this section or any move of the valuable trees along
the street.
Suan was then contracted for the trenchless pipe
rehabilitation. It fitted perfectly to the government requirement
without digging up the trench and destroy any trees during the
project. This success becomes Suan's symbolic project in this
business.
The Other Projects
|
Project of 2.1 km
Completed the rehabilitation of 2.1 km gas pipeline in 45
days. This is a very busy section and if traditional method is
used, traffic and all business will be impacted. |

|
High
Pressure Gas Pipeline
Another sample of busy city center. The gas
leakage brought great risk to the area. Suan completed the
project and saved the area from all the chaos which might have
been otherwise. |

|
Shijiazhuan
Project
The gas leakage happened in the school and
commercial center. It needed to move 4 schools and built 28
bypass bridges if used the traditional method. Suan completed
the project in 40 days without any impact to the schools and
the businesses in the area. |

|
East City
Center
Suan completed this project in 21 days. This
project had utilized new technologies and chemical components
to remove the stuff in the old pipe. |

|
Projection
Suan has secured projects for the full year of
2001. These projects will bring in income of over C$50 million.
Future Development
After China enters WTO in 2001, Suan will compete
with many foreign companies in the domestic market. Tagalder will
bring in a new team of management and technologies to make Suan more
efficient and competitive in the world market place.
(C lose